A | B | C | D | E | F | G | H | I | J | K | L | M | N | O | P | Q | R | S | T | U | V | W | X | Y | Z | |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
1 | JADWAL KULIAH PRODI SARJANA TEKNIK SIPIL & PRODI TEKNIK INFRASTRUKTUR LINGKUNGAN | |||||||||||||||||||||||||
2 | SEMESTER GENAP TAHUN AKADEMIK 2021/2022 | |||||||||||||||||||||||||
3 | (INFO LINK ZOOM SILAHKAN MENGHUBUNGI AKADEMIK S1 TS DAN S1 TIL) | |||||||||||||||||||||||||
4 | ||||||||||||||||||||||||||
5 | ||||||||||||||||||||||||||
6 | Waktu | R 210 (70 mhs) | R 211 (49 mhs) | R 212 (49 mhs) | R 213 (80 mhs) | R 307 (120 mhs) | R 308 (80 mhs) | R 310 (120 mhs) | R 309 (TIL) (25 mhs) | |||||||||||||||||
7 | S | 07:00 - 08:40 | Pengantar Teknik Transportasi (II/A) | Bahasa Indonesia (II/C) | Kalkulus dan Geometri Analitik (II/B) | Ekonomi Teknik (VI/C) | Analisis Struktur Statis Tak Tentu (VI/A) | |||||||||||||||||||
8 | AMN(1-5) MRF(6-7) / MRF(8) DWT*(9-14) | FNR* (1-7) / BKM(8-10) SPS(11-14) | Hadrian A (1-7) / NNM* (8-10)EPA (11-14) | RJY*(1-4) DLG(5-7) / ISI(8-11) TNH(12-14) | ASP* (1-7) / SPT (8-14) | |||||||||||||||||||||
9 | E | 09:00 - 10:40 11:30 | Pengantar Geologi dan Geoteknik (II/A) | Mekanika Fluida (II/B) | Fisika Mekanika (II/C) | Dinamika Struktur & Teknik Gempa (VI/A) | Analisis Struktur Metode Matrik (VI/B) | Keselamatan dan Kesehatan Kerja (VIII/A) | ||||||||||||||||||
10 | EPA(1-3)NAD (4)AFS(5-7) / | |||||||||||||||||||||||||
11 | N | Wahyu Wilopo (1-7) / FFA* (8-14) | KLN(1-4) BEN(5-7) /BWS(8-14) | MZI(8) TQA(9-10) ISI(11-14) | BSP(1-7) / ASP(8-10) IMS*(11-14) | MSL (1-7) / BSH*(8-14) | ASB (1-4) TNH (5-7) / TAG* (8-14) | |||||||||||||||||||
12 | 13.00 - 14.40 15.30 | Perancangan Geometri Jalan (IV/C) | Sistem Drainase & Jaringan Air Limbah (IV/B) | Mekanika Tanah Tegangan & Deformasi (IV/A) | Pemeliharaan Infrastruktur (VIII/A) | Bandar Udara (VIII/A) | Aplikasi Geosintetik (VIII/A) | Fisika Aplikasi | ||||||||||||||||||
13 | I | LBS(1-7) / IMT(8-11) ANT(12-14) | JSJ* (1-5) NAD (6-7)/NAD (8-9)BKM (10-14) | ARF(1-6) APM(7) / HCH(8-13) APM(14) | ATW (1-4) AFS (5-7) / ISI* (8-14) | DWT*(1-7) / TQA(8-10) WST(11-14) | HCH (1-7) / ADA* (8-14) | / INT* (8-14) | ||||||||||||||||||
14 | 15:30 - 17:10 | Hidraulika Saluran Terbuka (IV/C) | Sistem Drainase & Jaringan Air Limbah (IV/A) | Mekanika Tanah Tegangan & Deformasi (IV/B) | Teknologi Beton (VIII/A) | Manajemen Lalu Lintas (VIII/A) | Hidrologi Terapan(VIII/A) | PenyeIidikan Lokasi (VIII/A) | Kalkulus II | |||||||||||||||||
15 | N | BTA (1-7) / EPA (8-14) | JSJ (1-5) NAD (6-7)/NAD (8-9)BKM (10-14) | SIM*(1-6) APM(7) / TFF(8-13) APM(1) | MFS (1-6) AFS (7) / AFS (8) IMS* (8-14) | SMM* (1-7) / SPY (8-10) MRF(11-14) | RJY (1-7) / JSJ* (8-11) NAD (12-14) | ADA(1-5)HCH(6-7) / HCH(8-10)SHT(11-14) | Dewi KS (1-7) / NNM*(8-11) AHW(12-14) | |||||||||||||||||
16 | ||||||||||||||||||||||||||
17 | S | 07:00 - 08:40 | Teknik Fondasi Dangkal (IV/C) | Manajemen Sumberdaya Air (IV/B) | Hidraulika Saluran Terbuka (IV/A) | Struktur Kayu dan Bambu (VIII/A) | Pengantar Angkutan Barang & Sistem Logistik (VIII/A) | Bangunan Tenaga Air (VIII/A) | Kewirausahaan dan Life Skill (VI/B) | |||||||||||||||||
18 | ADA (1-7) / FFA (8-14) | FNR* (1-7) / RJY (8-14) | BWS (1-7) / BAK (8-14) | ISI* (1-7) / ALI (8-14) | SPY(1-4) ANT(5-7) / IMT*(8-14) | BTA* (1-14) | SHT* (1-7) / SDM (8-14) | |||||||||||||||||||
19 | E | 09:00 - 10:40 11:30 | Perangkat Lunak Teknik Sipil - Struktur (VI/A) | Perangkat Lunak Teknik Sipil - Hidro (VI/B) | Perangkat Lunak Teknik Sipil - Transportasi (VI/C) | Perangkat Lunak Teknik Sipil - Geoteknik (VI/D) | Perancangan Geometri Jalan (IV/A) | Fisika Mekanika (II/B) | Mekanika Fluida | |||||||||||||||||
20 | EPA(1-3)NAD(4)AFS(5-7)/ | |||||||||||||||||||||||||
21 | AMI*(1-7) / AMI(8) AFS(9-11) TNH(12-14) | IST (1-7) / RDT* (8-14) | MZI* (1-7) / MZI(8-11) TQA(12-14) | ARF*(1-5) FFA(6-7) / FFA(8-10)SIM(11-14) | SMM (1-7) / WST(8-11) ANT(12-14) | AMN(8)TQA(9-10)ATW(11-14) | NZ(1-4) BEN(5-7) / BTA*(8-14) | |||||||||||||||||||
22 | L | 13.00 - 14.40 15.30 | Dinamika Struktur & Teknik Gempa (VI/B) | Analisis Struktur Metode Matrik (VI/A) | Teknik Jalan Rel (VI/C) | Metode Numerik (IV/B) | Pemrograman Komputer (II/A) | Pengantar Geologi dan Geoteknik (II/C) | Kalkulus II | |||||||||||||||||
23 | A | BSP(1-7) / ASP (8-10) IMS*(11-14) | AMI (1-7) / BSH* (8-14) | SHT(1-7) / SMM*(8-11) MRF(12-14) | EPA (1-7) / BEN (8-14) | BEN (1-7)/AMI* (8-11) AFS (12-14) | I Gde Budi Indrawan (1-7) / TFF*(8-11) APM(12-14) | Dewi KS (1-7) / NNM(8-11) AHW(12-14) | ||||||||||||||||||
24 | S | 15:30 - 17:10 | Pemindahan Tanah Mekanis (VI/A) | Teknik Jalan Rel (VI/B) | Pelabuhan (VI/C) | Pengantar Teknik Transportasi (II/B) | Pemrograman Komputer (II/C) | Metode Pelaksanaan Konstruksi (VIII/A) | Kalkulus dan Geometri Analitik (II/A) | |||||||||||||||||
25 | A | SHT(1-6) TQA(7) / ATM*(8-12) TQA(13-14) | DMW (1-7) / IMT(8-11) MRF(12-14) | RDT (1-14) | SPY(1-2) MRF(5-7) / MRF(8) DWT(9-14) | BEN (1-7)/AMI (8-11) AFS (12-14) | ATW*(1-4) TNH(5-7) / HCH(8-11) NY(12-14) | Nur K (1-7) / SIM (8-11) AHW(12-14) | ||||||||||||||||||
26 | ||||||||||||||||||||||||||
27 | R | 07:00 - 08:40 | Konsep Keteknikan untuk Peradaban (II/A) | Konsep Keteknikan untuk Peradaban (II/B) | Konsep Keteknikan untuk Peradaban (II/C) | Manajemen Konstruksi (VI/A) | Ekonomi Teknik (VI/B) | Analisis Struktur Statis Tak Tentu (VI/C) | Konsep Keteknikan untuk Peradaban (Gabung dengan TS) | |||||||||||||||||
28 | SHT (1-7) /JSJ (8-14) | MSL (1-7) / BSP (8-14) | *ALI (1-7) / MSL (8-14) | TAG(1-4) TNH(5-7) / ASB* (8-14) | RJY(1-4) DLG(5-7) / NNM(8-11) AHW(12-14) | ISI (1-7) / AMI* (8-14) | ||||||||||||||||||||
29 | A | 09:00 - 10:40 11:30 | Fisika Mekanika (II/A) | Mekanika Fluida (II/C) | Pemrograman Komputer (II/B) | Perencanaan dan Penjadwalan Proyek (VIII/A) | Teknik Jalan Rel (VI/A) | Pelabuhan (VI/B) | ||||||||||||||||||
30 | EPA(1-3)NAD(4)AFS(5-7)/ | |||||||||||||||||||||||||
31 | AMN(8)TQA(9-10)DJS(11-14) | BAK (1-7) / DLG (8-14) | BEN (1-7)/AMI (8-11) AFS (12-14) | TAG (1-7) / ASBN* (8-14) | SHT(1-7) / DMW (8-14) | NY (1-7) / NZ (8-12) BEN (13-14) | ||||||||||||||||||||
32 | B | 13.00 - 14.40 15.30 | Metode Numerik (IV/A) | Perancangan Geometri Jalan (IV/B) | Metode Numerik (IV/C) | Hidraulika Terapan (VIII/A) | Teknik Jembatan (VIII/A) | Analisis Struktur Metode Matrik (VI/C) | ||||||||||||||||||
33 | EPA (1-7) / BTA (8-14) | ATM (1-7) / IMT*(8-11) ANT(12-14) | IST* (1-7) / JSJ (8-14) | APR* (1-7) / NAD (8-14) | MSL (1-7) / BSP* (8-14) | ASP (1-7) / BSH*(8-14) | ||||||||||||||||||||
34 | U | 15:30 - 17:10 | Mekanika Tanah Tegangan & Deformasi (IV/C) | Hidraulika Saluran Terbuka (IV/B) | Manajemen Sumberdaya Air (IV/A) | Teknik Sungai (VII/A) | Struktur Baja Grider dan Komposit (VIII/A) | Pengantar Kesehatan Masyarakat | ||||||||||||||||||
35 | FFA(1-6) APM(7) / ADA(8-13) APM(14) | BWS *(1-7) / BAK (8-14) | FNR* (1-7) / RJY (8-14) | BAK* (1-7) / NAD (8-14) | MFS (1-7) / MSL* (8-14) | … / BKM*(8-11) AHW(12-14) | ||||||||||||||||||||
36 | ||||||||||||||||||||||||||
37 | 07:00 - 08:40 | Teknik Fondasi Dangkal (IV/A) | Teknik Fondasi Dangkal (IV/B) | Manajemen Sumberdaya Air (IV/C) | Perbaikan Tanah (VIII/A) | |||||||||||||||||||||
38 | K | ARF* (1-7) / HCH (8-14) | TFF(1-4) APM(5-7) / SIM (8-14) | FNR* (1-7) / RJY (8-14) | HCH* (1-7) / ADA (8-14) | |||||||||||||||||||||
39 | A | 09:00 - 10:40 11:30 | Mekanika Fluida (II/A) | Bahasa Indonesia (II/B) | Kalkulus dan Geometri Analitik (II/C) | Ekonomi Teknik (VI/A) | Dinamika Struktur & Teknik Gempa (VI/C) | Geomatika dan SIG (IV/B) | Dasar-dasar Mikrobiologi | |||||||||||||||||
40 | KLN*(1-4) BEN(5-7) /BTA (8-14) | RDT (1-7) / DWT (8-14) | Made T (1-7) / KLN (8-10) AMI (11-14) | RJY(1-4) DLG(5-7) / NNM(8-14) | PYS(1-7) / ASP (8-10) IMS*(11-14) | Purnama Budi (1-14) | …. / SPS* (8-14) | |||||||||||||||||||
41 | M | 13.00 - 14.40 15.30 | Kalkulus dan Geometri Analitik (II/A) | Struktur Lepas Pantai (VIII/A) | Pengantar Teknik Transportasi (II/C) | Manajemen Konstruksi (VI/B) | Pelabuhan (VI/A) | Kimia Lingkungan | ||||||||||||||||||
42 | I | Nur K (1-7) / SIM (8-11) AHW(12-14) | NZ (1-7) / BSP* (8-14) | MZI(1-5) MRF(6-7) / MRF(8) DWT (9-14) | TAG(1-4) TNH(5-7) / ASB* (8-14) | BTA* (1-7) / NZ (8-12) BEN (13-14) | Lisendra / JSM* (8-14) | |||||||||||||||||||
43 | S | 15:30 - 17:10 | Sistem Drainase & Jaringan Air Limbah (IV/C) | Pelaksanaan Perkerasan (VIII/A) | Pengantar Kegempaan dalam Geoteknik (VIII/A) | Struktur Beton Prategang dan Pracetak (VIII/A) | ||||||||||||||||||||
44 | JSJ (1-5) NAD (6-7)/NAD (8-9)BKM (10-14) | LBS (1-7) / ATM*(8-11) TQA(12-14) | ARF (1-7) / FFA* (8-14) | DJS* (1-7) / ATW (8-14) | ||||||||||||||||||||||
45 | ||||||||||||||||||||||||||
46 | J | 07:00 - 08:40 | Pengantar Geologi dan Geoteknik (II/B) | Pengantar Manajemen Perkerasan Jalan (VIII/A) | Struktur Beton Bertulang Tahan Gempa (VIII/A) | Pengelolaan Sedimen Terpadu (VIII/A) | Mekanika Batuan (VIII/A) | |||||||||||||||||||
47 | Jarot Setyowiyoto (1-7) / ARF* (8-14) | LBS *(1-7) / ATM(8-11) MRF(12-14) | PYS (1-7) / SPT* (8-14) | BAK (1-7) APR (8-14) | ARF (1-7) / TFF* (8-11) APM (12-14) | |||||||||||||||||||||
48 | U | 09:00 - 10:40 11:30 | Kalkulus dan Geometri Analitik (II/B) | Kalkulus dan Geometri Analitik (II/C) | Bahasa Indonesia (II/A) | Manajemen Konstruksi (VI/C) | Analisis Struktur Statis Tak Tentu (VI/B) | |||||||||||||||||||
49 | Hadrian A (1-7) / NNM (8-10)EPA (11-14) | Made T (1-7) / KLN (8-10) AMI (11-14) | FNR (1-7) / BSP (8-14) | TAG(1-4) TNH(5-7) / ASB* (8-14) | ASP* (1-7) / MSL (8-14) | |||||||||||||||||||||
50 | M | |||||||||||||||||||||||||
51 | A | |||||||||||||||||||||||||
52 | 13.00 - 14.40 15.30 | Geomatika dan SIG (IV/A) | Geomatika dan SIG (IV/C) | |||||||||||||||||||||||
53 | T | Prijono Nugroho (1-14) | Djurdjani (1-14) | |||||||||||||||||||||||
54 | ||||||||||||||||||||||||||
55 | Catatan: | |||||||||||||||||||||||||
56 | 1) Mata kuliah yang dicetak tebal adalah 3 SKS | |||||||||||||||||||||||||
57 | 2) Ruang kuliah dapat berubah disesuaikan dengan jumlah mahasiswa | |||||||||||||||||||||||||
58 | ||||||||||||||||||||||||||
59 | ||||||||||||||||||||||||||
60 | ||||||||||||||||||||||||||
61 | ||||||||||||||||||||||||||
62 | ||||||||||||||||||||||||||
63 | ||||||||||||||||||||||||||
64 | ||||||||||||||||||||||||||
65 | ||||||||||||||||||||||||||
66 | ||||||||||||||||||||||||||
67 | ||||||||||||||||||||||||||
68 | ||||||||||||||||||||||||||
69 | ||||||||||||||||||||||||||
70 | ||||||||||||||||||||||||||
71 | ||||||||||||||||||||||||||
72 | ||||||||||||||||||||||||||
73 | ||||||||||||||||||||||||||
74 | ||||||||||||||||||||||||||
75 | ||||||||||||||||||||||||||
76 | ||||||||||||||||||||||||||
77 | ||||||||||||||||||||||||||
78 | ||||||||||||||||||||||||||
79 | ||||||||||||||||||||||||||
80 | ||||||||||||||||||||||||||
81 | ||||||||||||||||||||||||||
82 | ||||||||||||||||||||||||||
83 | ||||||||||||||||||||||||||
84 | ||||||||||||||||||||||||||
85 | ||||||||||||||||||||||||||
86 | ||||||||||||||||||||||||||
87 | ||||||||||||||||||||||||||
88 | ||||||||||||||||||||||||||
89 | ||||||||||||||||||||||||||
90 | ||||||||||||||||||||||||||
91 | ||||||||||||||||||||||||||
92 | ||||||||||||||||||||||||||
93 | ||||||||||||||||||||||||||
94 | ||||||||||||||||||||||||||
95 | ||||||||||||||||||||||||||
96 | ||||||||||||||||||||||||||
97 | ||||||||||||||||||||||||||
98 | ||||||||||||||||||||||||||
99 | ||||||||||||||||||||||||||
100 |